It will be easy to reach Greater Noida from Ghaziabad: Metro network will be laid on 72.2 km route, there will be connectivity with 25 stations
Ghaziabad News: Namo Bharat train will be expanded to provide direct connectivity between two important cities of Delhi NCR. To connect Ghaziabad to Greater Noida West, NCRTC will prepare the DPR of the project by April 3. Jewar Airport will be connected to Siddharth Vihar, Ghaziabad via Pari Chowk, Yida City. A total of 25 stations will be built on this route which can later be increased to 38 stations.
This is the whole matter,
there is no direct connectivity between Greater Noida West and Ghaziabad. People were demanding public transport on this route for a long time. Due to lack of public transport facility between the two areas, people have to face traffic jams every day. Noida Authority and NCRTC have planned to directly connect Ghaziabad and Jewar airports. Three routes were proposed for this. After brainstorming today, instructions have been given to NCRTC to finalize the route and prepare a DPR.
The elevated route will be 72.2 km.
A station named Ghaziabad South for Namo Bharat train will be built in Siddharth Vihar, Ghaziabad. From here, Namo Bharat train will start which will be connected via Char Murti, Pari Chowk, Yida City to Jewar Airport. The length of this entire elevated route will be 72.2 km. The special thing about this route is that Metro and Namo Bharat train will run together on this route. There will be 11 stations of Namo Bharat train on the route while 14 stations of metro will be built. Which can later be expanded to 38 stations.
The route will be ready by 2031.
In view of the increasing possibilities of population in this area, the important project of connecting Greater Noida West and Greater Noida directly with Delhi and Ghaziabad has got the green signal. Delhi NCRTC spokesperson Puneet Vats said that the route was discussed in the meeting with Yamuna Authority. Now NCRTC will prepare and submit the detailed project report by April 3. After which it will be sent to the government for permission. He said that considering the potential of passengers in these areas, it has been decided to build the project. According to the visibility report, the construction work of the route to connect Ghaziabad via Greater Noida West will be completed by 2031.
Stations to be built on this route
- Siddharth Vihar
- Ghaziabad South
- Greater Noida Sector-16c
- Eco Tech-12
- Greater Noida Sector-2
- Greater Noida Sector-3
- Greater Noida Sector-10
- Greater Noida Sector-12 Knowledge Park V
- Police Line Surajpur,
- Surajpur RRTS Station,
- Malakpur Ecotech-2,
- Knowledge Park-3,
- Gamma-1 Pari Chowk,
- Omega-2, PHI-3 Ecotech,
- IE Ecotech-4,
- Dankaur Yida North Sector-18,
- Yida Central Sector-21 Noida International Airport.